TECHNIP INDIA |
RELIANCE BANGLADESH LNG TERMINAL |
FEED for Marine facility development for LNG import Terminal. Regasification capacity 750 MMSCFD onboard FSRU. Power plant capacity 3000 MW- including CAPEX. |
TECHNIP INDIA |
LNG/GAS INFRASTRUCTURE DEVELOPMENT PROJECT, SRI LANKA |
DFR Study & FEED of LNG terminal in Sri Lanka Port for LNG Jetty Facilities – including |
SSLNG-SINGAPORE |
SMALL SCALE LNG AND FSRU INFRASTRUCTURE PROJECT |
Concept studies for various options for floating LNG Regas & storage solutions, viz. (FSRU, FSU with Regas on jetty, floating power barge, FSRP) including study of various jetty configurations |
SSLNG-SINGAPORE |
BARGE BASED SMALL SCALE FSRU
|
FEED Engineering until approval in principle from Bureau Veritas |
LNTIEL (L&T INFRASTRUCTURE ENGINEERING LTD.) |
DEVELOPMENT OF LNG FACILITY AT KAKINADA SEAPORT FOR H-ENERGY WITH LNTIEL |
Advanced Pre-FEED & TEFR- Jetty topside facilities, LNG Import, Onshore storage, – including CAPEX, OPEX |
TECHNIP INDIA |
REVIEW OF DESIGN OF FSRU BASED LNG TERMINAL AS LENDERS ENGINEERS (LE) |
Review of complete Design Package for LNG Jetty and Associated facilities |
CONFIDENTIAL, SINGAPORE |
CONCEPT DEVELOPMENT OF LNG BREAKBULK FACILITY OFFSHORE |
Development of CONCEPTUAL STUDY REPORT & subsequent BASIC ENGINEERING of facility for importing, storing and distribution of LNG through ISO containers & SSLNG ship. |
VEDAM DESIGN & TECHNICAL CONSULTANCY |
CONVERSION OF LNGC TO FSU |
LNGC to FSU conversion project (BOG Management, HMB Analysis, Flow Analysis, Material Selection, Piping GA, Stress Analysis, BOQ etc.) |
EXCEL LNG LLC |
LNG IMPORT & REGAS TERMINAL IN CARIBBEANS
|
Pre-feed study and FEED Package for Marine facilities, Onshore Storage & Regasification Facility |
HOWE INDIA (ADANI) |
BUNKERING FACILITY AT MUNDRA |
Pipe stress analysis and Surge analysis for bunkering facility at Mundra |
HOWE INDIA (ADANI) |
NAPHTHA UNLOADING AND EXPORT FACILITY |
HAZOP study & QRA for Naphtha unloading facilities at Mundra port |
KBR, USA |
DEASPHALTING UNIT REFINERY EXPANSION |
3-D model generation using AVEVA PDMS 12.1 sp4 version for modular Deasphalting unit and Plot Plan Development. |
JSW INFRASTRUCTURE |
LNG & RLNG PIPELINES FROM FSRU TO ONSHORE
|
Pipe stress analysis calculation report |
HOWE INDIA (ADANI) |
DHAMRA |
Feasibility Study of LNG Receiving and Loading Facility in Road Tankers |
HOWE INDIA (ADANI) |
LPG HANDLING FACILITITES DEVELOPMENT -DHAMRA |
Pre-FEED for LPG handling |
HOWE INDIA (ADANI) |
DEVELOPMENT OF OFFSHORE JETTY FACILITIES FOR CRUDE OIL TRANSFER AT MUNDRA |
Feasibility study of offshore jetty (Island Jetty) and SPM for crude (from VLCC) transfer operation through subsea pipeline length of 2.8 kms. |
MOTT-MAC DONALD |
STRESS & SURGE ANALYSIS
|
Stress & Surge Analysis for POL Products- Tank farm area (approx. 4 kms) and Dock lines (2.5 km x 3 lines) |
HOWE INDIA (ADANI) |
SEA WATER INTAKE SYSTEM AND PUMP HOUSE DEVELOPMENT |
Conceptual Study on Sea water intake system design, sea water pipeline design |
NAYARA |
NAYARA JETTY EXPANSION |
Detailed Feasibility Report for New Berth Development, Berth Topside facilities & Pipeline network facilities-including CAPEX. |
EXCEL LNG |
LNG IMPORT TERMINAL IN CARIBBEAN ISLAND |
FEED package for LNG import terminal of 0.4 MMTPA capacity-including CAPEX and EPC TENDER. |