Client : KPMG
The proposed appropriate effluent treatment scheme along with well designed, adequate effluent treatment units to meet the statuary norms for treated effluent. To estimate the capital and operation costs of the proposed effluent treatment systems.
Client : EXCEL LNG
FEED package for LNG import terminal of 0.4 MMTPA capacity-including CAPEX and EPC TENDER.
Client : NAYARA
Detailed Feasibility Report for New Berth Development, Berth Topside facilities & Pipeline network facilities-including CAPEX.
Client : HOWE INDIA (ADANI)
Conceptual Study on Sea water intake system design, sea water pipeline design
Client : MOTT-MAC DONALD
Stress & Surge Analysis for POL Products- Tank farm area (approx. 4 kms) and Dock lines (2.5 km x 3 lines)
Client : HOWE INDIA (ADANI)
Feasibility study of offshore jetty (Island Jetty) and SPM for crude (from VLCC) transfer operation through subsea pipeline length of 2.8 kms.
Client : HOWE INDIA (ADANI)
Pre-FEED for LPG handling
Client : HOWE INDIA (ADANI)
Feasibility Study of LNG Receiving and Loading Facility in Road Tankers
Client : JSW INFRASTRUCTURE
Pipe stress analysis calculation report
Client : KBR, USA
3-D model generation using AVEVA PDMS 12.1 sp4 version for modular Deasphalting unit and Plot Plan Development.